The roadmap is focused on validation, release, and scale

The sequence is clear: finish the current architecture sprint, prove the production path, release v1 cleanly, then expand the platform with stronger creation tools and broader surfaces.

Roadmap at a glance

  • v0 and v0.9 are done.
  • v0.95 is the current transition sprint.
  • v1 is the next major release target.
  • v2 and v3 extend the platform after launch.
0.95

Finish the transition

Close the remaining operational proofs, align runtime behavior, and make the current architecture safe to rely on.

Now
1.0

Launch the platform

Ship the public release with stronger creator UX, more Sidecars, remix flow, and cleaner session behavior.

Aug 2026
2.0

Expand the surface area

Add more expressive Sidecars, richer co-creation, and broader device and interaction support.

Q1 2027
3.0

Build the ecosystem

Open the SDK, support the marketplace, and scale toward a durable creator economy around interactive art.

Q3 2027

Strategic priority

  • Protect creator trust.
  • Keep the runtime contract simple.
  • Preserve the platform moat while widening the product moat.